Last fall, Caltrans insisted there was no way to save an 80-foot redwood that it planned to chop down when it replaces the historic Green Bridge in Point Reyes Station. It turns out there was.
PG&E, which would have removed the tree for Caltrans, has found a solution. The tree, which stands beside the Point Reyes Animal Hospital, might still need to be trimmed, but a new plan will employ an additional temporary utility pole…